Cherokee Residence, Asheville NC: Construction Progress

posted February 22nd, 2014

The interior finishes are beginning to take shape.  Gypsum board has been installed and much of the interior cypress paneling is completed.  The new floors , window and door trim, and interior cabinetry are next.
Brickstack Architects_1302_14 02.21-1 Brickstack Architects_1302_14 02.21-2 Brickstack Architects_1302_14 02.21-3 Brickstack Architects_1302_14 02.21-4 Brickstack Architects_1302_14 02.21-5